Storage Capacity 100 GWh
Max. Injection Rate 2 165 MWh/day (60 days of injection acc. to injection curve)
Max. Withdrawal Rate 4 220 MWh/day (30 days of iwithdrawal acc. to withdrawal curve)
Product long-term
Storage period 1 storage year (1.4.2019 – 1.4.2020)

 

Auction Terms 12 February 2019_fixed price

Auction Date: 12 February 2019, 10:00 a.m. (CET)
Stoarge Capacity: 100 GWh
Contract Type: Long-term
Storage period: 1 April 2019; 6:00 a.m. – 1 April 2020; 6:00 a.m

The Auction Terms conform to Regulation No. 349/2015 Coll. on the Gas Market Rules English version of the Auction terms is for information purposes only.  The original is the Czech version..
For additional information please contact: blazej@gasstorage.cz
Radim Blažej Tel.: +420 778 447 072

 

Auction Terms_20190212

SAMPLE_Storage Contract_20190212