Information on a facility shutdowns/limitations due to maintenance

Date of storage limitation
Limitation of storage daily flowrates during maintenance in %
Type Additional Information
Injection daily flowrate Withdrawal daily flowrate
30.10.2017 – 12.11. 2017 100 % 100 %  planned  Maintenance at MS Brumovice
10.9.2018 – 23.9.2018 100 % 100 % planned Regular maintenance at UGS Uhřice
13.9.2018, 20.9.2018 17 % 17 % planned

Limitation caused by N4G

(cleaning of pipeline DN 700 RU

Mutěnice – PRS V.Němčice)

30.10.2018, 1.11.2018 50 % 50 % planned

Limitation caused by N4G

(cleaning of pipeline DN 700 RU

Mutěnice – PRS V.Němčice)

3.6. – 16.6.2019 100 % 100 % planned Regular maintenance at UGS Uhřice
14.9. – 27.9.2020 100 % 100 % planned Regular maintenance at UGS Uhřice
14. – 22. 9. 2020 100 % 100 % planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky

Updated on 31th January 2020