CURRENT

Operational information

Total available withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
12.5.2024 84 825 45 057
11.5.2024 83 304 44 557
10.5.2024 83 305 44 557
9.5.2024 83 305 45 357
8.5.2024 83 307 46 557
7.5.2024 83 307 46 613
6.5.2024 83 306 46 613
5.5.2024 83 316 46 613
4.5.2024 83 307 46 613
Total contracted withdrawal and injection capacities
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
12.5.2024 69 825 31 557
11.5.2024 68 316 31 557
10.5.2024 68 316 31 557
9.5.2024 68 316 31 557
8.5.2024 68 316 31 557
7.5.2024 68 316 31 613
6.5.2024 68 316 31 613
5.5.2024 68 316 31 613
4.5.2024 68 316 31 613
Interrupted interruptible capacity and price
From
To
Date Withdrawals (MWh/day) Injections (MWh/day) Price
11.5.2024 0 0 0
Size of interrupted firm storage capacity
From
To
Date Withdrawals (MWh/day) Injections (MWh/day)
11.5.2024 0 0
Actual stock level and daily values of injection and withdrawal
From
To
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
11.5.2024 2 364 529 12 28 073
Storage capacity
Year Total technical capacity (GWh) Contracted capacity (GWh)  Free capacity (GWh)
2024/25 3,630 3,630 0
2025/26 3,630 2,984.4 645.6
2026/27 3,630 2,600 1,030
Storage Development – Capacity and Outputs
 Storage Year  Working Gas Volume [GWh] Max. contractual withdrawals [GWh/day] Max. contractual injections [GWh/day]
 
2029 3,650 98 60
2028 3,650 98 60
2027 3,650 98 60
2026 3,630 98 60
2025 3,630 98 60
2024 3,630 98 60
2023 3,696 98 60
2022 3,420 96 59
2021 3,420 107 59
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
14.5. 06:00 - 17.5. 06:00 2024 100% 100% planned Maintenance at MS Brumovice
9.9. 06:00 - 23.9. 06:00 2024 100% 100% planned Regular maintenance at UGS Uhřice
11.9. 06:00 - 24.9. 06:00 2023 100% 100% planned Regular maintenance at UGS Uhřice
12. 9. – 25. 9. 2022 100% 100% planned Regular maintenance at UGS Uhřice
13.9 - 26.9.2021  100% 100% planned Regular maintenance at UGS Uhřice
30. - 31.8.2021 100% 100% planned Maintenance at MS Brumovice – testing of alarm/shutdown sequences
14. – 22. 9. 2020 100% 100% planned Limitation caused by TSO (Net4Gas), repair works of pipeline DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% planned Regular maintenance at UGS Uhřice
3.6. – 16.6.2019 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2018, 1.11.2018 50% 50% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% planned Limitation caused by N4G (cleaning of pipeline DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% planned Regular maintenance at UGS Uhřice
30.10.2017 – 12.11.2017 100% 100% planned Maintenance at MS Brumovice
Available daily firm/interruptible capacity
Date Daily Firm Rate Daily Interruptible Rate
Injection Withdrawal Injection Withdrawal
12.5.2024 N/A N/A 8 500 010 -10 000 010
13.5.2024 5 000 000 -5 000 000 10 000 010 -10 000 010
14.5.2024 0 0 0 0